皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【单选题】
在Dreamweaver CS6中,为图像建立热点,热点形状可以为【】
A.
圆形
B.
正方形
C.
多边形
D.
以上都是
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【单选题】Which statement about the deck line is TRUE ________.
A.
The top of the deck line is marked at the highest point of the freeboard deck,including camber,at the midships point
B.
A vessel with wooden planks on a steel deck will have the deck line marked at the intersection of the upper line of the wood sheathing with the side shell
C.
The deck edge is marked at the intersection of the freeboard deck with the side shell,at the lowest point of sheer,with the vessel at even trim
D.
On a vessel with a rounded stringer-sheer plate,the deck line is marked where the stringer plate turns down from the plane of the deck line
【单选题】在下列选项中,不正确的函数原型格式为( )。
A.
int Function(int a);
B.
void Function(a*b);
C.
void Function(char);
D.
void int (double *a);
【单选题】A short raised deck above the main deck at bow is called the().
A.
fore deck
B.
fore quarter
C.
aft quarter
D.
forecastle deck
【判断题】配送管理系统形成配送优化线路后,不允许业务人员临时更改或调整线路。
A.
正确
B.
错误
【单选题】在下列选项中,不正确的函数原型格式为()。
A.
int Function(int a);
B.
void Function (char);
C.
int Function(a);
D.
void int(double* a);
【简答题】背景 某高校新建一栋20层留学生公寓,主体是全现浇钢筋混凝土框架剪力墙结构,建筑面积为38400㎡,建筑高度为62.6m,筏板基础,筏板厚度1.4m。 施工单位依据基础形式、工程规模、现场和机具设备条件以及土方机械的特点,选择了挖土机、推土机、自卸汽车等土方施工机械,编制了土方施工方案后组织施工。 本工程开工时间为10月15日,由于工期比较紧,冬期必须连续施工,结构施工期间正好跨越整个冬施期。 屋...
【单选题】观察下面的算式,中括号运用恰当的是( )
A.
(13+52)×[62-16]
B.
20×[69-(17+23)]
C.
[160-93÷3]×9
【单选题】观察下面的算式,中括号运用恰当的是 ( )
A.
(13 + 52) × [62 - 16]
B.
20 × [69 - (17 + 23)]
C.
[160 - 93 ÷ 3] × 9
D.
[ 60 × 48 ] ÷( 24 - 18 )
【单选题】It is possible,and sometimes necessary, to strengthen the deck of a vessel for carriage of deck cargo by().
A.
placing bunker on the deck
B.
building a stage on which to place the cargo
C.
welding steel feet to the deck, on which the cargo is placed
D.
erecting vertical pillars under the deck to support the cargo
【单选题】To shore up the main deck for the stowage of deck cargo means to().
A.
weld pad eyes on deck in proper position to secure the cargo
B.
strengthen the main deck by placing pillars underneath it in the tween-decks
C.
distribute the weight of the cargo by placing fore-and-aft planks on the main deck
D.
package the cargo in wooden crates so it will not damage the deck
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题