• The exporter checks carefully all the terms and conditions listed in the L/C. If all terms and conditions are acceptable, the exporter will make the shipment within the time specified in the L/C. If some terms and conditions in the credit cannot be compiled with, the exporter should reject the L/C immediately and require amendments. The amendments of the L/C must be made before the shipment of the goods, or the bank might dishonor the draft.