【单选题】You are a network administrator for your company. The network consists of a single Active Directory domain. The company has offices in 25 cities. Each office is configured as a single site. You are re...
A.
Create a new SMTP site link between your site and each of the other sites.
B.
Configure one domain controller in your site as a global catalog server.
C.
Configure both domain controllers in your site to use a fixed port when replicating.
D.
Create a VPN between your site and the site at the main office.
【单选题】Where is the main producing site of Somatomedin?
【简答题】Which of the following is the main reason for choosing Alamogordo as the test site? A) It always had an enjoyable climate. B) It was connected to other cities by a railway. C) Its location would hide ...
【简答题】【背景资料】 某城市给水工程项目,通过招标投标确定了本市一家具有承担该工程项目资质的施工企业实施施工任务。 施工企业在给水厂站工程施工时制定了以下施工技术要求。 (1)水池底板混凝土应分层分次浇筑完成。 (2)水池底板混凝土浇筑采用掺外加剂的泵送混凝土时,其坍落度不宜小于150mm。 (3)水池池壁混凝土应分层浇筑完成,每层混凝土的浇筑厚度不应超过40mm,沿池壁高度均匀摊铺。 施工企业在开槽埋管...
【单选题】Your company has a main office and 20 branch offices.Each office contains an Exchange Server 2010 Mailbox server and an Exchange Server 2010 Hub Transport server. Each office is configured as a separa...
A.
From the Exchange Management Shell, modify the Exchange-specific site link costs.
B.
From the Exchange Management Shell, configure the main office site as a hub site.
C.
From Active Directory Sites and Services, modify the site link costs.
D.
From Active Directory Sites and Services, remove all IP site links and then create new SMTP site links.