【多选题】A new switch is being installed in the Ezonexam network and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that...
A.
You must set each end of the trunk line to IEEE 802.1e encapsulation.
B.
You must set the same VTP management domain name on both switches.
C.
You must set all ports on the two switches as access ports.
D.
You must configure one of the switches as a VTP server.
E.
You must use a rollover cable to connect the two switches.