【单选题】Goods will be shipped ( )30 days after receipt of the L/C.
【单选题】In accordance with the relevant provisions of the UCP600, the issuing bank must review these documents within reasonable time the next day up to ( ) after receipt of the relevant documents.
【判断题】某水利工程,在施工图纸没有完成前,业主将工程发包给一家总承包单位,因设计工作还未完成,所以承包范围内待施工的工程虽性质明确,但是还难以确定工程量。为了减少双方的风险,双方通过协商,决定采用总价合同形式签订施工合同。合同中规定:甲方向乙方提供施工场地的水文与工程地质、地下主要管网路线以及施工设计图纸等资料,供乙方参考使用。
【单选题】术者一手在手术关节施行㨰法的同时,另一手做该关节的摇动手法,使手术关节同时受到㨰、摇两法复合作用的手法,称为
【单选题】Goods will be shipped 30 days after receipt of the mentioned L/C.
【单选题】Payments shall be made by us after receipt of the shipping documents specified in clause 10 of this contract.
A.
我方将在接到符合本合同第10条规定的货运单据之后付款。
B.
本合同的第10条特别规定付款需在收到装货文件之后。
C.
本合同的第10条规定我方需在收到货运单据之后付款。
【简答题】to be opened within days after receipt of the Seller's advice that the goods are ready for shipment
【单选题】In order to avoid buyer’s nonpayment after receipt of the goods, or seller’s non-shipment after receipt of the payment, which of the following payment term is more binding on the buyer and seller?
【单选题】产品组合组合中产品项目的总数是产品组合中的( )。
【单选题】Documents examination should be finished within ( ) after receipt of the documents.