皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【单选题】
为了增大放大电路的动态范围,其静态工作点应选择
A.
截止点
B.
饱和点
C.
交流负载线的中点
D.
直流负载线的中点
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【单选题】Thousands of people took part in the work when the Three Gorges project _____.
A.
would be built
B.
was building
C.
were being built
D.
had been built
【简答题】The _____ is the main project of the three gorges hydropower station, the largest hydropower project in the world.
【单选题】NEC refused the offer from Perry Capital because_____
A.
the bit by Perry is not ideal.
B.
it is afraid of losing its chip unit.
C.
the condition raised by Perry is unreasonable.
D.
it regards its chip unit as an inseprable part.
【单选题】Thousands of people took part in the work when the Three Gorges project (三峡工程) _____.
A.
was built
B.
was building
C.
was being built
D.
had been built
【简答题】Thousands of people took part in the work when the Three Gorges Project ( 三峡工程 ) _____.A. would be built B. was building C. was being built D. had been built
【简答题】The Chinese People Congress has voted in favor___the Three Gorges Dam on the Yangtze River, the biggest hydroelectric project in the world. (填介词)
【简答题】某施工单位承建一住宅楼小区工程的施工。该工程其中一个单体栋号(5号楼)建筑面积为15720m2,地下二层,地上十二(局部十七)层。建筑物占地面积为741.3m2。东西向长80.26m,南北向宽18.76m。基底相对标高为-5.895m,+0.000相对标高为55.15m。 在施工前,施工单位编制了各分部分项工程施工方案,其中包括《××住宅楼小区4号楼土方开挖施工方案》。 在该施工方案中确定的工期计...
【简答题】Thousands of people took part in the work when the Three Gorges project (三峡工程) _____.
【单选题】Thousands of people took part in the work when the Three Gorges project (三峡工程) _____.
A.
would be built
B.
was building
C.
was being built
D.
had been built
【单选题】The Three Gorges Project is a hydroelectric dam that spans the Yangtze River by the town of __________, in the Yiling District of Yichang, Hubei province.
A.
HUangniu Rock
B.
Sandouping
C.
Mt Maogong
D.
Xiling gorge
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题