【单选题】A segregated ballast system is a system where ().
A.
all ballast is processed through the oily water separator
B.
ballast is taken on and discharged through a separate main deck riser
C.
ballast and cargo tanks are separated by cofferdams
D.
all ballast lines, tanks, and pumps are independent of those used for oil
【单选题】The capacity of the segregated ballast tanks shall be ______ determined that the ship may operate safely on ballast voyages without recourse to the use of cargo tanks for water ballast except as provi...
【多选题】企业应当综合运用( ABCD )等风险应对策略,实现对风险的有效控制 企业应当综合运用( ABCD )等风险应对策略,实现对风险的有效控制 企业应当综合运用( ABCD )等风险应对策略,实现对风险的有效控制 企业应当综合运用( ABCD )等风险应对策略,实现对风险的有效控制 下列有关企业内部控制的表述中,正确的有( )。
A.
内部控制不仅仅是制度和手册,而是渗透到企业活动之中的一系列行为
【单选题】( ) 1. Our workshop was equipped with new _________.
【单选题】The ballast pump is in good order. 02010491
A.
The ballast pump is out of order.
B.
The ballast pump work well.
C.
There is something wrong with the ballast pump.
D.
The ballast pump dose not run smoothly.
【简答题】项目风险管理中常用的应对策略有:风险回避策略、风险转移策略、风险减轻策略、 、风险储备策略。
【单选题】Please transfer 15.5 tons of ballast water from No 2 starboard. 02010501
A.
The amount of ballast water transferred is 15.5 tons.
B.
There will be totally 50.5 tons of ballast water transferred.
C.
The ballast water will be transferred from No.2 to No.1.
D.
No transfer with the ballast water.