【单选题】166 In which of the following cost estimating techniques are statistics models used:
A.
nonparametric cost estimating
B.
parametric cost estimating
C.
life cycle cost estimating
【单选题】______is one of the techniques used for estimating activity durations.
B.
Precedence Diagramming Method(PDM)
C.
Dependency Determination
D.
Schedule network Templates
【单选题】( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
【单选题】84 In which of the following cost estimating techniques are statistics models used:
A.
nonparametric cost estimating
B.
parametric cost estimating
C.
life cycle cost estimating
【单选题】Estimating schedule activity costs involves developing an(69)of the costs of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costi...
【单选题】In which of the following cost estimating techniques are statistics models used:
A.
. nonparametric cost estimating
B.
. parametric cost estimating
C.
. life cycle cost estimating
D.
. bottom-up estimating
【单选题】感染病区的管理下列哪项正确:( )
C.
不同传染病人应分开安置,病房设置单人和2~4人病房,床位距离要有1.2M
D.
病房配备有抽风、空气消毒系统,或每房配置负离子消毒机
E.
危重抢救室应与护士办公室相邻,便于护士经常进入病房观察病情。