皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【简答题】
今天(课程设计第二天)的作业要求,在昨天选车的基础上,同学们以小组为单位进行小车结构的详细设计,每个小组开始零件的设计和三维模型图的绘制。注意,一个零件对应一张零件图,最后再将零件图进行装配。今天上午11:30之前将你所完成零件,以图片的形式提交。
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【简答题】有一列由三个数组成的数组(1、1、1)、(2、4、8)、(3、9、27)…第八个数组是______,第100个数组的三个数的和是______,读作______.
【单选题】At 0845,you are approaching the entrances to Thimble Shoal Channel. What channel must you use?()
A.
The South Auxiliary Channel since your draft is less than 25 feet (7.6 meters),and you are not a passenger vessel
B.
The South Auxiliary Channel or Thimble Shoal Channel,but you must remain on the right hand side of the main channel
C.
The North Auxiliary Channel since you are going to turn to a northerly heading near buoy "12"
D.
You are not permitted to use any of the channels,but must remain outside the buoyed channel line
【单选题】You must use ______ to open the bottle. Or you can borrow a bottle opener from the neighbor. [     ]
A.
strength
B.
force
C.
power
D.
energy
【判断题】八进制数是由1、2、3、4、5、6、7、8这八个数组成的。
A.
正确
B.
错误
【单选题】阅读下面的程序找出哪一行出错#include "stdio.h"void main(){ double num1,num2,num3; 1 printf("请输入两个数据"); 2 scanf("%lf%lf",num1,num2); 3 num3=num1+num2; 4 printf("两数之和为%lf",num3); }
A.
1
B.
2
C.
3
D.
4
【单选题】You are proceeding down a channel and lose the engine(s).You must use the anchors to stop the ship.Which statement is true ________.
A.
Pay out all of the cable before setting up on the brake to insure the anchors dig in and hold
B.
For a mud,mud and clay,or sandy bottom pay out a scope of 5 to 7 times the depth before setting up on the brake
C.
Use one or both anchors with a scope of twice the depth before setting the brake
D.
Drop the anchor to short stay and hold that scope
【简答题】实验八+一维数组.doc
【单选题】阅读下面的程序找出哪一行出错#include "stdio.h"void main(){ char ch; 1 printf("请输入一个字符"); 2 ch=getchar(); 3 printf("刚刚输入的字符为"); 4 printf("%f",ch);}
A.
1
B.
2
C.
3
D.
4
【单选题】If you want to learn English well, you must use it as _______ as possible. [     ]
A.
often
B.
long
C.
hard
D.
soon
【简答题】试题五(15分) 阅读以下说明,请回答问题1至问题3,将解答填入答题纸的对应栏内。 【说明】 A信息系统集成公司有员工50多名,其中技术部开发人员有30多人。公司采用矩阵式的组织结构。公司的主营业务是开发企业信息化建设方面的项目,业务较为繁忙,一般有十多个项目在同时进行。由于技术人员有限,为保证各个项目的进展,人员在项目间的兼职与交叉很严重。一个技术开发人员在M项目上工作两天后,很可能转入Y项目工...
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题