【单选题】根据工程量清单计算规范,下列项目中可以按长度计算的有()。
【单选题】My wife __ me there right now.
【单选题】They waited and waited. _____ they had been looking forward to.
D.
Then did the hour come
【简答题】It was recommended that they __ for the doctor. A.has waited B. waited C. should wait D. should have waited
【简答题】上午9:50左右,某施工队在靠泊在五区码头的“远兴”液化气轮第二货舱右附近的栈桥上切割需更换的栏杆。在此之前,因需要到第二货舱的隔离舱勘验工程而隔离舱的道门被提前打开了,根据以往的做法,没有安排对隔离舱进行测爆。隔离舱的道门距离切割栏杆的施工点很近。在切割过程中切割的火花溅入隔离舱的道门中,引燃了积聚在隔离舱底部的液化气而造成剧烈爆炸,不但使隔离舱变形,而且致使相临的第二右货舱的液化气储罐钢板变形...
【单选题】根据《建设工程工程量清单计价规范》(GB 50500—2008),下列有关分部分项工程量清单计价与措施项目清单计价的对比中,正确的是( )。
A.
分部分项工程量清单项目有十二位项目编码,措施项目仅九位编码
B.
对于分部分项工程,投标人须按招标人提供的工程量清单填报价格,而措施项目,投标人可据实增加项目内容报价
C.
分部分项工程量清单计价表中,有统一的计量单位,而措施项目清单计价表中计量单位由投标人确定
D.
分部分项工程量清单计价表中,应填写综合单价与合价,并以单价为准,而措施项目清单计价表中,也须填写单价,但它以合价为准
【简答题】A.They waited for each other at different concerts. B.They waited for each other at different places. C.They went to the street corner at different times. D.The man went to the concert but the woman d...