皮皮学,免费搜题
登录
搜题
【单选题】
The meeting has been cancelled. Ann ____ all that work .
A.
need to do
B.
need have
C.
needn't have done
D.
needed not to do
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【单选题】The word 'convergence'(in Para. 3) means__________.
A.
revolution.
B.
communication.
C.
integration.
D.
transmission.
查看完整题目与答案
【单选题】关于胸膜的描述错误的是()
A.
胸膜顶超出锁骨上方2~3cm
B.
分脏胸膜和壁胸膜两部分
C.
壁胸膜又分为胸膜顶、肋胸膜、膈胸膜和纵隔胸膜
D.
肋胸膜与膈胸膜转折处为胸膜腔最低点
E.
两侧胸膜腔通过肺根互相交通
查看完整题目与答案
【单选题】Which of the following configuration management activities is part of the Perform Integrated Change Control Proces?
A.
Compare actual project performance against the project management plan.
B.
Update scope management plan.
C.
Identify and document the functional and physical characteristics of the project’s products.
D.
Verify deliverables for completeness.
查看完整题目与答案
【单选题】This book does not have an ______ structure. Some parts are even contradictory .
A.
integrated
B.
informed
C.
intensive
D.
inward
查看完整题目与答案
【判断题】在用手把手示教编程实现ptp控制时,它只记录个轨迹程序移动的两端点位置。
A.
正确
B.
错误
查看完整题目与答案
【单选题】Because futures contracts are standardized, they are very useful for quotation and trading.
A.
正确
B.
错误
查看完整题目与答案
【单选题】以下关于胸膜的描述错误的是
A.
脏胸膜可分为肋胸膜、膈胸膜、纵膈胸膜和胸膜顶四个部分
B.
胸膜是衬覆在胸壁内面、膈上面和肺表面的浆膜
C.
胸膜分壁层和脏层
D.
胸膜顶的位置最高
查看完整题目与答案
【单选题】Which of the following controls leads to standardized behavior and standardized work outputs?
A.
Output control
B.
Bureaucratic control
C.
Feedback control
D.
Feedforward control
查看完整题目与答案
【简答题】standardized ________
查看完整题目与答案
【单选题】145 When a project incorporates an Organizational Breakdown Structure (OBS), it is integrated with the WBS at the
A.
task
B.
level of effort
C.
sub-task
D.
project
E.
work package
查看完整题目与答案
相关题目:
【单选题】The word 'convergence'(in Para. 3) means__________.
A.
revolution.
B.
communication.
C.
integration.
D.
transmission.
查看完整题目与答案
【单选题】关于胸膜的描述错误的是()
A.
胸膜顶超出锁骨上方2~3cm
B.
分脏胸膜和壁胸膜两部分
C.
壁胸膜又分为胸膜顶、肋胸膜、膈胸膜和纵隔胸膜
D.
肋胸膜与膈胸膜转折处为胸膜腔最低点
E.
两侧胸膜腔通过肺根互相交通
查看完整题目与答案
【单选题】Which of the following configuration management activities is part of the Perform Integrated Change Control Proces?
A.
Compare actual project performance against the project management plan.
B.
Update scope management plan.
C.
Identify and document the functional and physical characteristics of the project’s products.
D.
Verify deliverables for completeness.
查看完整题目与答案
【单选题】This book does not have an ______ structure. Some parts are even contradictory .
A.
integrated
B.
informed
C.
intensive
D.
inward
查看完整题目与答案
【判断题】在用手把手示教编程实现ptp控制时,它只记录个轨迹程序移动的两端点位置。
A.
正确
B.
错误
查看完整题目与答案
【单选题】Because futures contracts are standardized, they are very useful for quotation and trading.
A.
正确
B.
错误
查看完整题目与答案
【单选题】以下关于胸膜的描述错误的是
A.
脏胸膜可分为肋胸膜、膈胸膜、纵膈胸膜和胸膜顶四个部分
B.
胸膜是衬覆在胸壁内面、膈上面和肺表面的浆膜
C.
胸膜分壁层和脏层
D.
胸膜顶的位置最高
查看完整题目与答案
【单选题】Which of the following controls leads to standardized behavior and standardized work outputs?
A.
Output control
B.
Bureaucratic control
C.
Feedback control
D.
Feedforward control
查看完整题目与答案
【简答题】standardized ________
查看完整题目与答案
【单选题】145 When a project incorporates an Organizational Breakdown Structure (OBS), it is integrated with the WBS at the
A.
task
B.
level of effort
C.
sub-task
D.
project
E.
work package
查看完整题目与答案