皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【简答题】
After a year of record mortgage foreclosures and slumping home prices, Americans are more determined to shape up their flabby finances in 2008 than their bodies, according to a study released by Countrywide Bank on Tuesday. Some 67 percent of the 1,002 adults surveyed nationwide said that becoming financially fit is a top New Year's resolution, while 57 percent are committed to becoming physically fit in 2008. By gender, women are more insecure about their finances, with 37 percent saying they are financially fit, compared with 55 percent for men. Dads are more confident about finances than moms, and single people feel more secure than the married. Geographically, U.S. Northeasterners felt better about their money, with 52 percent saying their are financially fit. The Midwest and South were tied at the bottom with 43 percent feeling secure about finances. Countrywide Bank is part of Countrywide Financial Corp, the largest mortgage lender in the United States with a big stake in the troubled subprime mortgage market. It has been battered by escalating loan defaults.
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【单选题】166 In which of the following cost estimating techniques are statistics models used:
A.
nonparametric cost estimating
B.
parametric cost estimating
C.
life cycle cost estimating
D.
bottom-up estimating
E.
All of the above
【单选题】喉息肉最常发生于()。
A.
会厌
B.
声门下
C.
室带
D.
杓(披裂)间区
E.
声带
【单选题】______is one of the techniques used for estimating activity durations.
A.
Analogous Estimating
B.
Precedence Diagramming Method(PDM)
C.
Dependency Determination
D.
Schedule network Templates
【单选题】On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating, activity duration estimating, and()are so tightly linkedthat they are viewed as a single process ...
A.
time estimating
B.
cost estimating
C.
project planning
D.
schedule development
【单选题】( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
A.
Parametric
B.
Analogous
C.
Three-point
D.
Expert judgment
【单选题】84 In which of the following cost estimating techniques are statistics models used:
A.
nonparametric cost estimating
B.
parametric cost estimating
C.
life cycle cost estimating
D.
bottom-up estimating
E.
All of the above.
【单选题】Estimating schedule activity costs involves developing an(69)of the costs of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costi...
A.
accuracy
B.
approximation
C.
specification
D.
summary
【单选题】In which of the following cost estimating techniques are statistics models used:
A.
. nonparametric cost estimating
B.
. parametric cost estimating
C.
. life cycle cost estimating
D.
. bottom-up estimating
E.
. All of the above.
【单选题】喉息肉最常发生于( )
A.
会厌
B.
声带
C.
室带
D.
声门下
E.
杓(皲裂)间区
【判断题】窑洞也许是人类最古老的建筑形式之一。
A.
正确
B.
错误
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题