【单选题】If a ship will call at four ports for discharging, i.e.A.B.C and D consecutively, the cargo for ______ must generally be loaded first. A.Port A B.Port B
【单选题】与短期成本考虑的因素相比,长期成本需要着重考虑以下哪一种因素:()
【简答题】材料: During the morning of 2 August 1999 the supply vessel Putford Worker was working cargo at installations in the North Sea. She had completed operations at one installation without incident. At 1110...
【多选题】A — Packing Specification B — Packing Cost C — Keep Upright D — Radioactive E — Poison Gas F — Keep Dry G — This Side Up H — Inflammable Liquid I — Use No Hooks J — Keep Away from Cold K — Indicative ...
【单选题】与短期成本考虑的因素相比,以下哪一种因素是长期成本需要着重考虑的?()
【单选题】Bilge soundings indicate ______.
A.
the amount of condensation in the hold
B.
whether the cargo is leaking or not
C.
whether the vessel is taking on water
【单选题】Every new crude oil tanker of 20 000 tons deadweight and above shall be fitted with a cargo tank cleaning system using ______.