皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【简答题】
Introduction The country of Mahem is in a long and deep economic recession with unemployment at its highest since the country became an independent nation. In an attempt to stimulate the economy the government has launched a Private/Public investment policy where the government invests in capital projects with the aim of stimulating the involvement of private sector firms. The building of a new community centre in the industrial city of Tillo is an example of such an initiative. Community centres are central to the culture of Mahem. They are designed as places where people can meet socially, local organisations can hold conferences and meetings and farmers can sell their produce to the local community. The centres are seen as contributing to a vibrant community life. The community centre in Tillo is in a sprawling old building rented (at $12,000 per month) from a local landowner. The current community centre is also relatively energy inefficient. In 2010 a business case was put forward to build a new centre on local authority owned land on the outskirts of Tillo. The costs and benefits of the business case are shown in Figure 1. As required by the Private/Public investment policy the project showed payback during year four of the investment. Figure 1: Costs and benefits of the business case for the community centre at Tillo New buildings built under the Private/Public investment policy must attain energy level targets and this is the basis for the estimation, above, of the energy savings. It is expected that the new centre will attract more customers who will pay for the centre’s use as well as increasing the use of facilities such as the cafeteria, shop and business centre. These benefits are estimated, above, under increased income. Finally, it is felt that staff will be happier in the new building and their motivation and morale will increase. The centre currently employs 20 staff, 16 of whom have been with the centre for more than five years. All employees were transferred from the old to the new centre. These benefits are shown as better staff morale in Figure 1. Construction of the centre 2010–2011 In October 2010 the centre was commissioned with a planned delivery date of June 2011 at a cost of $600,000 (as per Figure 1). Building the centre went relatively smoothly. Progress was monitored and issues resolved in monthly meetings between the company constructing the centre and representatives of the local authority. These meetings focused on the building of the centre, monitoring progress and resolving issues. Most of these issues were relatively minor because requirements were well specified in standard architectural drawings originally agreed between the project sponsor and the company constructing the centre. Unfortunately, the original project sponsor (an employee of the local authority) who had been heavily involved in the initial design, suffered ill health and died in April 2011. The new project sponsor (again an employee of the local authority) was less enthusiastic about the project and began to raise a number of objections. Her first concern was that the construction company had used sub-contracted labour and had sourced less than 80% of timber used in the building from sustainable resources. She pointed out the contractual terms of supply for the Private/Public policy investment initiatives mandated that sub-contracting was not allowed without the local authority’s permission and that at least 80% of the timber used must come from sustainable forests. The company said that this had not been brought to their attention at the start of the project. However, they would try to comply with these requirements for the rest of the contract. The new sponsor also refused to sign off acceptance of the centre because of the poor quality of the internal paintwork. The construction company explained that this was the intended finish quality of the centre and had been agreed with the previous sponsor. They produced a letter to verify this. However, the letter was not counter-signed by the sponsor and so its validity was questioned. In the end, the construction company agreed to improve the internal painting at their own cost. The new sponsor felt that she had delivered ‘value for money’ by challenging the construction company. Despite this problem with the internal painting, the centre was finished in May 2011 at a cost of $600,000. The centre also included disability access built at the initiative of the construction company. It had found it difficult to find local authority staff willing and able to discuss disability access and so it was therefore left alone to interpret relevant legal requirements. Fortunately, their interpretation was correct and the new centre was deemed, by an independent assessor, to meet accessibility requirements. Unfortunately, the new centre was not as successful as had been predicted, with income in the first year well below expectations. The project sponsor began to be increasingly critical of the builders of the centre and questioned the whole value of the project. She was openly sceptical of the project to her fellow local authority employees. She suggested that the project to build a cost-effective centre had failed and called for an inquiry into the performance of the project manager of the construction company who was responsible for building the centre. ‘We need him to explain to us why the centre is not delivering the benefits we expected’, she explained. Required: (a) The local authority has commissioned the independent Project Audit Agency (PAA) to look into how the project had been commissioned and managed. The PAA believes that a formal ‘terms of reference’ or ‘project initiation document’ would have resolved or clarified some of the problems and issues encountered in the project. It also feels that there are important lessons to be learnt by both the local authority and the construction company. Analyse how a formal ‘terms of reference’ (project initiation document) would have helped address problems encountered in the project to construct the community centre and lead to improved project management in future projects. (13 marks) (b) The PAA also believes that the four sets of benefits identified in the original business case (rental savings, energy savings, increased income and better staff morale) should have been justified more explicitly. Draft an analysis for the PAA that formally categorises and critically evaluates each of the four sets of proposed benefits defined in the original business case. (12 marks)
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【单选题】精神障碍者实施的最多的犯罪种类是()
A.
高技术犯罪
B.
暴力犯罪
C.
经济犯罪
D.
有组织犯罪
【判断题】免疫透射比浊分析时,溶液中存在的抗原抗体复合分子应足够大,分子太小则阻挡不了光线的通过。
A.
正确
B.
错误
【简答题】It suddenly__________to me that somebody might be able to lend us the money. A.came B. turned C. referred D. occurred
【单选题】关于免疫透射比浊分析,下列描述错误的是
A.
基本原理是测定一定体积的溶液通过的光线量,由于溶液中抗原抗体复合物粒子对光线反射和吸收,透射光减少,测定的光通量与抗原抗体复合物的量呈反比
B.
溶液中存在的抗原抗体复合物分子应足够大,分子太小则阻挡不了光线的通过
C.
溶液中抗原抗体复合物的数量不需要太多,以免影响光通量的测定
D.
检测仍需抗原抗体反应的温育时间,检测时间较长
E.
测量的是透过不溶性复合物到达探测器而未被散射或吸收的光线
【单选题】It suddenly ______ to me that we could use a computer to do the job.
A.
took place
B.
occurred
C.
came about
D.
happened
【单选题】A warm thought suddenly came to me _____ I might use the pocket money to buy some flowers for my mother’s birthday.
A.
it
B.
when
C.
that
D.
which
【简答题】A 14-year-old Chinese boy overcame two of humankind’s most dreaded fears — getting stuck in an elevator and getting homework 1 (do) in a single night, owing to his calm-witted character. Sun Yixiao wa...
【单选题】—Which driver was to blame? —Why,_____!It was the child’s fault,clear and simple.He suddenly came out between two parked cars.
A.
both
B.
each
C.
either
D.
neither
【单选题】It suddenly ______ to the detective that the professor was probably murdered by his own wife .
A.
came about
B.
took place
C.
happened
D.
occurred
【判断题】我突然想起他让我帮他收拾行李,因为他明天要出差。 ---- It suddenly came to me that he had asked me to pack up for him because he was leaving on vocation tomorrow.
A.
正确
B.
错误
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题