【单选题】Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()
A.
Verify the ISV application runs on AIX 5.2
B.
Power4 to POWER5 upgrades are not supported without a application recompile
C.
Check the placement and size of the boot logical volume and disk space requirements on the S85
D.
AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
【简答题】Since joining Goldman as a financial yst in the equity division in 2000, Prior -- whose IQ score of 238 puts him in the top 1% of the world's population -- has risen from performing basic research...
【单选题】An administrator has made several topology and resource group changes on one node in a running cluster.During verification and synchronization, using the "Emulate" option, many errors are reported. Th...
A.
Perform a synchronization from a node without the changes.
B.
Apply the cluster snapshot on both nodes while the cluster is running.
C.
"Restore HACMP Configuration Database from Active Configuration" on the node where the changes weremade
D.
Stop the cluster using the option "Unmanage Resource Groups" and apply the cluster snapshot on thenode where the changes were made
【单选题】A cluster script failed because it was unable to set the hostname, and the Cluster Manager reported the event failure. What must be done prior to sue the "HACMP Problem Determination Tools" -> "Recove...
A.
Nothing, the "Recover From Script Failure" will correct the issue.
B.
Disable and re-enable the effected Ethernet adapter by using ifconfig.
C.
Correct the error by setting the hostname on the effected node from the command line.
D.
Verify that the clinfo daemon is running prior to executing the "recover from scriptfailure".