皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【简答题】
—When can I come for the photos? I need them this afternoon. —They should be ready by 12 o'clock. You can______us, sir. [A] wait on [B] watch on [C] depend on [D] call on
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【单选题】The following costs have arisen in relation to the production of a product: (i) Planning and concept design costs (ii) Testing costs (iii) Production costs (iv) Distribution and customer service costs...
A.
(iii) only
B.
(i), (ii) and (iii) only
C.
(i), (ii) and (iv) only
D.
All of the above
【单选题】下列物质中不能发生银镜反应的是
A.
葡萄糖
B.
蔗糖
C.
淀粉水解产物
D.
纤维素水解产物
【简答题】Transportation is a ____in the design and management of logistics systems. It may account for ____of total logistics costs.
【单选题】某孕妇,孕37周,血压150/100mmHg,尿蛋白2.0g/24小时,伴头晕、眼花、上腹部不适,应诊断为
A.
妊娠合并慢性高血压
B.
子痫前期轻度
C.
子痫前期重度
D.
子痫
E.
妊娠期高血压
【单选题】________ costs involve efforts to improve product design for more efficient production processes.
A.
Prevention
B.
Appraisal
C.
Internal failure
D.
External failure
【单选题】One goal of ________ is to design costs out of products in the research, development, and engineering stage.
A.
cost-plus pricing
B.
target costing
C.
Kaizen costing
D.
traditional costing
【单选题】Square D uses 3-D computer-aided design and manufacturing tools that significantly speed up ________ and cut down on development costs.
A.
design process
B.
machining process
C.
industrial flow
D.
R&D
【简答题】第(7)题__________ 查看材料
【简答题】Costs in the building design include: 1.____________
【单选题】____ to the original design by local carpenters cut production time and costs.
A.
Justifications
B.
Modifications
C.
Advocations
D.
Implications
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题