皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【简答题】
Time off (childcare / annual leave / public holiday) 1) I am so busy at the moment that I worked on New Year's Day, which is a(n) ___________ . 2) How many days' ____________ do you get in your company?
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【判断题】用键盘上的方向键可以微调对象的位置
A.
正确
B.
错误
【单选题】( )召开中国人民政治协商会议第一届全体会议。
A.
1949
B.
1950
C.
1951
D.
1953
【多选题】A local area network uses a _____________ or ____________to connect computers together.
A.
hub
B.
protocol
C.
data
D.
router
【单选题】系谱绘制是从家族中第一个就诊或被发现的患病成员开始的 , 这一个体称
A.
受累者
B.
携带者
C.
患者
D.
先证者
E.
以上都不对
【多选题】We will study together some knowledge about( ).
A.
starting a business
B.
Company benefits
C.
business code/protocol
D.
recruitment
【多选题】To configure the VLAN trunking protocol to communicate VLAN information between two switches, what two requirements must be met?()
A.
Each end of the trunk line must be set to IEEE 802.1E encapsulation.
B.
The VTP management domain name of both switches must be set the same.
C.
All ports on both the switches must be set as access port.
D.
One of the two switches must be configured as a VTP server.
E.
A rollover cable is required to connect the two switches together.
F.
A router must be used to forward VTP traffic between VLANs.
【单选题】欺辱是儿童之间经常发生的()
A.
伤害性行为
B.
攻击性行为
C.
模仿性行为
D.
普遍性行为
【多选题】To configure the VLAN trunking protocol to communicate VLAN information between two switches, what two requirements must be met?()
A.
Each end of the trunk line must be set to IEEE 802.1E encapsulation.
B.
The VTP management domain name of both switches must be set the same.
C.
All ports on both the switches must be set as access ports.
D.
One of the two switches must be configured as a VTP server.
E.
A rollover cable is required to connect the two switches together.
F.
A router must be used to forward VTP traffic between VLANs.
【单选题】( )召开中国人民政治协商会议第一届全体会议。
A.
1949
B.
1945
C.
1948
D.
1921
【单选题】植物体内执行有机物运输的无核活细胞是
A.
伴胞
B.
筛分子
C.
导管分子
D.
管胞
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题