【判断题】The fixed costs in the flexible budget are the same as the planning budget because they do not change in response to changes in the activity level within the relevant range.
【判断题】The fixed overhead flexible-budget variance is the difference between actual fixed overhead costs and the fixed overhead costs in the flexible budget.