皮皮学,免费搜题
登录
搜题
【单选题】
用反馈复位法来改变由 8 位二进制加法计数器的模值,可以实现( )模值范围的计数。
A.
1-256
B.
1-32
C.
1-16
D.
1-15
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【简答题】Not many years ago, some farmers were worried because hawks were taking many of their chicken. The farmers didn’t know what to do. Finally they went to the country officials and asked for help. “Kill ...
查看完整题目与答案
【单选题】________ for a long time, the fields are all dried up and the farmers are worried about this year’s crops.
A.
There having been no rain
B.
There been no rain
C.
There having no rain
D.
There being no rain
查看完整题目与答案
【单选题】It________heavily for 2 weeks and the farmers were very worried.
A.
has been raining
B.
had been raining
C.
has rained
D.
had been rained
查看完整题目与答案
【简答题】All the farmerswere worried, because if it didn’t rain, their crops wouldn't grow, and theymight starve _____ death.A. to B. from C. in D. with
查看完整题目与答案
【单选题】下面不属于施工组织设计的作用的是()
A.
只能作为投标书的核心内容和合同文件的一部分,用于工程投标。
B.
是施工准备工作的重要组成部分, 是指导开展紧凑、有序施工活动的技术依据 •
C.
直接为组织材料、机具、设备、劳动力需要量的供应和使用提供数据
D.
可以合理利用和安排为施工服务的各项临时设施,可以合理地部署施工现场,确保文明施工和安全施工
查看完整题目与答案
【单选题】原尿中的营养物质,再次进入到这些管壁周围的毛细血管内,称为 __ 。
A.
选择性回收
B.
非选择性回收
C.
选择性回流
D.
非选择性回流
查看完整题目与答案
【单选题】下面不属于施工现场准备工作的是 ( )
A.
四通一平
B.
现场临时办公用房
C.
测量放线准备
D.
施工脚手架准备
查看完整题目与答案
【单选题】The farmers are very worried, because a lot of crops have for lack of rain.
A.
shrank
B.
withered
C.
decreased
D.
declined
查看完整题目与答案
【单选题】下列不属于雨期施工准备工作的是( )。
A.
施工现场及生产、 生活基地的排水设施畅通, 雨水可从排水口顺利排除
B.
现场道路路基碾压密实, 路面硬化处理。 道路要起拱, 两旁设排水沟, 不滑、 不陷、 不积水
C.
大型高耸物件有防风加固措施, 外用电梯要做好附墙
D.
水泥应存入仓库, 仓库要求完全密封, 四周有排水沟
查看完整题目与答案
【单选题】电气施工员的施工准备包括技术准备,现场准备及组织准备,其中下列各项中不属于现场准备的是( )。
A.
现场“四通一平”(即水、电供应,道路、通讯通畅,场地平整)的检验和试用
B.
进行现场抄平、测量放线工作并进行检验
C.
根据进度计划和施工平面图,合理组织材料、构件、机具、半成品等陆续进场,进行检验和试运转
D.
根据进度要求,组织现场临时设施的搭建施工,安排好职工的衣、食等后勤保障工作
查看完整题目与答案
相关题目:
【简答题】Not many years ago, some farmers were worried because hawks were taking many of their chicken. The farmers didn’t know what to do. Finally they went to the country officials and asked for help. “Kill ...
查看完整题目与答案
【单选题】________ for a long time, the fields are all dried up and the farmers are worried about this year’s crops.
A.
There having been no rain
B.
There been no rain
C.
There having no rain
D.
There being no rain
查看完整题目与答案
【单选题】It________heavily for 2 weeks and the farmers were very worried.
A.
has been raining
B.
had been raining
C.
has rained
D.
had been rained
查看完整题目与答案
【简答题】All the farmerswere worried, because if it didn’t rain, their crops wouldn't grow, and theymight starve _____ death.A. to B. from C. in D. with
查看完整题目与答案
【单选题】下面不属于施工组织设计的作用的是()
A.
只能作为投标书的核心内容和合同文件的一部分,用于工程投标。
B.
是施工准备工作的重要组成部分, 是指导开展紧凑、有序施工活动的技术依据 •
C.
直接为组织材料、机具、设备、劳动力需要量的供应和使用提供数据
D.
可以合理利用和安排为施工服务的各项临时设施,可以合理地部署施工现场,确保文明施工和安全施工
查看完整题目与答案
【单选题】原尿中的营养物质,再次进入到这些管壁周围的毛细血管内,称为 __ 。
A.
选择性回收
B.
非选择性回收
C.
选择性回流
D.
非选择性回流
查看完整题目与答案
【单选题】下面不属于施工现场准备工作的是 ( )
A.
四通一平
B.
现场临时办公用房
C.
测量放线准备
D.
施工脚手架准备
查看完整题目与答案
【单选题】The farmers are very worried, because a lot of crops have for lack of rain.
A.
shrank
B.
withered
C.
decreased
D.
declined
查看完整题目与答案
【单选题】下列不属于雨期施工准备工作的是( )。
A.
施工现场及生产、 生活基地的排水设施畅通, 雨水可从排水口顺利排除
B.
现场道路路基碾压密实, 路面硬化处理。 道路要起拱, 两旁设排水沟, 不滑、 不陷、 不积水
C.
大型高耸物件有防风加固措施, 外用电梯要做好附墙
D.
水泥应存入仓库, 仓库要求完全密封, 四周有排水沟
查看完整题目与答案
【单选题】电气施工员的施工准备包括技术准备,现场准备及组织准备,其中下列各项中不属于现场准备的是( )。
A.
现场“四通一平”(即水、电供应,道路、通讯通畅,场地平整)的检验和试用
B.
进行现场抄平、测量放线工作并进行检验
C.
根据进度计划和施工平面图,合理组织材料、构件、机具、半成品等陆续进场,进行检验和试运转
D.
根据进度要求,组织现场临时设施的搭建施工,安排好职工的衣、食等后勤保障工作
查看完整题目与答案
参考解析:
知识点:
题目纠错 0
发布