【多选题】工程建设监理的目标控制就是对工程项目的()三大目标组成的项目目标系统实施控制
【单选题】The rate of heat transfer in a water-tube auxiliary boiler can be increased by .
A.
operating the boiler at less than normal water level
B.
installing fins on the firesides of water-tubes
C.
increasing the amount of excess air to the burners
D.
treating the boiler water with chemical oxygen scavengers
【单选题】工程建设项目三大目标:投资、进度、质量之间关系是()。
C.
三大目标之间既存在相互矛盾、彼此对立的一面也存在着统一的一面
【单选题】生产企业自营或委托出口的货物当其申报办理出口退税时,应()。
C.
向其所在地主管征税的税务机关或出口退税机关申报办理
D.
报经其主管征税的税务机关审核后,再向其所在地出口退税税务机关申报办理
【单选题】If over a period of weeks the air-box pressure of a turbo-charged, diesel engine, operating at full load, appears to be dropping off, the cause can be _____.
B.
loss of cooling water to the diffuser
C.
gradual fouling of the air filters
D.
improperly timed exhaust valves
【简答题】已知下列两反应所处状态完全相同: (1) Ni + Cu 2+ ⇌Ni + +Cu (2)1/2Ni + 1/2Cu 2+ ⇌1/2Ni + +1/2Cu 则 E 1 y /E 2 y = ,lgK 1 y /lgK 2 y = 。
【单选题】工程项目投资、进度、质量三大目标之间的关系是()。
【单选题】Quality control is normally performed by the _____ . A . QA personnel
【单选题】工程项目质量、进度、投资三大目标中,最核心的是( )。
【简答题】已知下列两反应所处状态完全相同: (1)Ni+Cu 2+ Ni 2+ +Cu; (2) 则 ______, ______。