皮皮学,免费搜题
登录
logo - 刷刷题
搜题
【简答题】
在以下哪些情况下,买受人应当承担标的物毁损、灭失的风险?(    ) A.标的物已运抵交付地点,买受人因标的物质量不合格而拒绝接受 B.出卖人已经将标的物发运,即将到达约定的交付地点 C.合同约定在标的物所在地交货,约定时间已过,买受人仍未前往提货 D.买受人下落不明,出卖人将标的物提存
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
参考答案:
举一反三
【简答题】Frame(英译汉)
【简答题】专业词汇英译汉 (1)( ):circular frame tunnel portal (2)( ):end wall tunnel portal (3)( ):wing wall tunnel portal (4)( ):post tunnel portal (5)( ):high-speed railway
【简答题】将下列专业英语,英译汉 ( 1 ) circular frame tunnel portal ( 2 ) end wall tunnel portal ( 3 ) wing wall tunnel portal ( 4 ) post tunnel portal / column tunnel portal ( 5 ) bench tunnel portal / step tunnel portal...
【简答题】A hydrocarbon structure can serve as frame work to which various heteroatoms can be attached. (英译汉)
【简答题】英汉互译 1、cold and hot frame 2、lean-to house 3、plastic-clad plant enclosure 4、low tunnel 5、tissue culture 6、out-of-season flowers and vegetables 7、bamboo stick 8、rush mat 9、shading system 10、protected cu...
【简答题】单词英汉互译 married nephew frame niece sister-in-law 6. 大伯子,小叔子,姐夫,妹夫 7.堂兄弟,表姐妹 8.父亲,母亲 9.未婚的,单身的 10.姑母,舅母,婶母
【简答题】英汉互译 The train's wheels are attached to this frame.
【简答题】英译汉: 1. frame; 2. protocol; 3. brouter; 4. segment; 5. data packet
【判断题】我国《票据法》明确规定,本票自出票之日起,付款期限最长不得超过一个月。
A.
正确
B.
错误
【单选题】They made a firm_to support us.
A.
pledge
B.
effort
C.
plan
D.
mind
相关题目:
参考解析:
知识点:
题目纠错 0
发布
创建自己的小题库 - 刷刷题