Which of the following statement related job costing is not true?
A.
In job costing system, the labor cost is collected in the time sheet.
B.
In job costing system, the material cost can be extracted from material requisition
C.
In job costing system, the overhead is charged by a predetermined overhead absorption rate.
D.
In job costing system, the overhead is charged on the actual basis.